Trailer renovation: new subfloor, framing and drywall

Town
Naples, FL
Duration
In progress, started October 2026
Materials
Plywood subfloor, framing lumber, fiberglass insulation, drywall, prehung interior doors, trim, wood-look plank flooring
Service
Doors and Windows, Flooring, Framing and Drywall
Outside the trailer, with the old flooring bagged for removal. 6 seconds, no sound.

This trailer came to us with a failing floor and a tired interior. The slider below shows the main room from the same spot: stripped to the studs with the subfloor going down, then three weeks later with the walls closed in and new plank flooring down. Paint and crown molding are still to come.

Main room

Main room after: walls closed in and new plank flooring down, with protective paper still on the floorMain room stripped to the studs and insulation with new plywood subfloor going down

Kitchen end and side doorway

The same end of the home with the floor finished and walls ready for paint, looking past the side doorway to the kitchenCrew rebuilding the floor framing beside the side doorway, walls open to the studs

The same end of the home, with the side doorway on the right as the landmark. Before: floor framing open to the ground and walls down to the studs. After: solid floor, walls closed in and ready for paint, and the kitchen opened to the living area.

Latest photos

The kitchen cabinets are going in, the back room has its new floor, door and closet, and the new beam is in place. Paint and crown molding are still to come.

Stage one: gut and subfloor

The crew stripped the rooms back to the studs and joists, cut out the damaged subfloor, repaired the floor framing, and laid new plywood while the plumbing and electrical runs were open and easy to reach.

Stage two: insulation, drywall, doors and trim

With the floor solid, the exterior walls were insulated and drywalled, new prehung interior doors were hung and squared with a laser level, and the trim was cut and fitted on site.

Stage three: flooring down, paint and crown molding next

Wood-look plank flooring is down through the main living areas and the windows and sliding door are in. A new beam has been installed and boxed in across the ceiling, and the kitchen cabinets are going in. Still to do: painting the walls and ceilings and adding crown molding. This page will be updated when the job wraps.